Stationary pump skills
Operators and relevant equipment management personnel should carefully read the operating instructions and master structural principles, operation and maintenance as well as pumping concrete operations.
The ground supporting the stationary pump should be flat and solid. The pump location should not only be convenient for the concrete mixing truck to enter and exit and feed to the hopper, it should also be accessible for the pumping distribution pipe in order to reduce pumping pressure loss. At the same time, it should be close to the pouring site and convenient for power supply and water supply.
In the process of concrete pumping, with the increment of pump pressure, pumping impact may force the pipe to move back and forth. This may result in pumping pressure loss, which can lead to damage of the pipe clamp and aprons as well as other issues.
After being connected, the concrete pump should be inspected in accordance with the operating instructions, and the machine should not be started until it meets the requirements.
When construction takes place in hot weather, it is advisable to cover the concrete conveying pipe with a wet straw bag, wet cover cloth and other materials to avoid direct sunlight and prevent the concrete from blocking the pipe.
Horizontal pipes of a certain length should be laid between the concrete pump and the vertical piping to ensure sufficient resistance to prevent the back flow of concrete.
When construction takes place in cold weather, concrete conveying pipes should be wrapped with insulation materials to prevent the concrete inside the pipe from freezing.
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
A call for prevention and sensitive re-use.
The CIAT principal designer register
Providing assurance and verification of the capability and competence of registered ATs.
Building Safety recommendations and Northern Ireland
The NI roadmap to improving safety in high rise residential.
BSA residential sector competence standards guidance
BSAS 01:2024 Organisational Capability Management System Standard - Competence Assurance.
Specifying rendered external wall insulation for fire safety
How to interrogate the evidence provided to the specifier.
The benefits of writing articles for your organisation
How to create a profile for your organisation and publish for free.
No Falls Week. The importance of safe working at height
What to expect and what is on offer to avoid accidents.
Scottish Government action to reach net-zero targets
Retrofit expert group highlight critical actions needed.
A forward thinking, inclusive global community of members.
From engineered product life-spans, to their extension.
Circular economy in the built environment
A brief description from 2021. Where are we now?
CLC publishes domestic retrofit competency framework
Roadmap of Skills for net zero.
Understanding is key to conservation.
Open industry engagement survey seeks responses
Institutions and the importance of engagement.